Saturday, November 28, 2009

Brook Rd, Day Four

Yesterday was a day of forward movement. By that, I mean we got the ceiling up.The day started out by loading up the big toys into the back of the truck; Compressor, Nail Guns, Table Saw and Chop Saw.


Table Saw, Chop Saw, Nail Guns and Compressor loaded on the truck

 Before tackling the ceiling however, we went on the side of the house to fill an old hole that had been uncovered during pressure washing. We filled the hole with some stucco patch, let it dry and repeated the previous process to build up layers within the hole. We then finished it off by texturing it to match the rest of the house.


Hole in the wall



First layer of stucco



Hole fully filled and textured

While the layers of filler were drying, we pressed on with putting up the new ceiling boards.


First board nailed into place



Second board


First row complete


Ceiling complete up to the first fan power box


Second power box




All ceiling boards in place

After the ceiling was completed we had just enough day light left to cut all the pieces of trim that go around the perimeter of the ceiling. 

 