Friday, April 27, 2012

BT Mail Boxes


Preparing the Site





Pouring the Concrete





Finishing the Slab



Ready for Mail Box Installation





Moving the Mail Boxes




Installing in New Location






Mail Boxes in their new Home






Foundations for Notice Board





Notice Board installed.





Tuesday, April 17, 2012

333 CMC


BEFORE WE BEGIN




Preparing for Concrete Pad




Dismantling the Cage





Water trapped in old cage




Phase 1 and 2 Finished
Waiting on Footings Inspection






The Slab has Been Poured



Smoothing the Slab



Waiting for the Concrete to Dry




Washing Down the Existing Deck




Repairing the Old Deck



Texturing the New Concrete






Painting the Rear of the Home




First Coat of Sealer





Second Coat of Sealer




The Cage has Arrived




New Cage Construction



The Finished Product