Tuesday, July 26, 2011

708 OPC - Countertops


BEFORE WE BEGIN







Leveling the Wall



Top Installed



Installing the Main Area
 



ALL FINISHED 






Wednesday, July 20, 2011

1259 RS - Roof

Broken Tiles Found in Various Locations
   

 Large Damaged Area, Probably Caused by Falling Skylite


 Patching the Roof Membrane

 New Tiles in Place

Unsealed Vent Pipe


A bit of Over-Kill, but the Pipe is Sealed

Tuesday, July 19, 2011

7749 BC - Shower

UPSTAIRS BATHROOM

Doors Removed

Tile Removed

 Cracks in the Base

 Damage to the Subfloor

 Removing the Subfloor

Hole in the Floor

New Subfloor Section

New Base in Place

Hardie Installed

First Wall Tiled

Second Wall Tiled

All Tiled and Starting to Grout

Finished Grouting

 Installing the Doors

 All Finished




LAUNDRY ROOM CEILING

The Hole

Closed Up

Taped and Mudded

Textured and Painted



DOWNSTAIRS BATHROOM

Tiles Removed

Installing the Tray

Starting the Tiling

2 Walls Done

All Done and Ready for Grouting

Grouted

Sealed and Finished



OWNER'S CLOSET

New Lock on Owner's Closet