Saturday, November 28, 2009

Brook Rd, Day Five

Today was the day we had set aside to do a lot of the fiddly things such as the doors and and finishing trim work. We started with the garage door. First the door was pressure washed, then swept down once dry and then we started to apply the paint.


First touch of paint




Door nearing completion

While the garage door was being completed, we removed all the other doors to the house and set them up in the garage to be painted. For the wood doors, this meant taping up all the windows before we were able to begin.


Smaller door nearly fully taped


Halfway through staining the larger door

We also set about pressure washing the pool cage today.


Pressure washing tearing through the dirt


Cleaning the slide

We even found time before sun down to complete the ceiling.




 