Tuesday, April 17, 2012

333 CMC


BEFORE WE BEGIN




Preparing for Concrete Pad




Dismantling the Cage





Water trapped in old cage




Phase 1 and 2 Finished
Waiting on Footings Inspection






The Slab has Been Poured



Smoothing the Slab



Waiting for the Concrete to Dry




Washing Down the Existing Deck




Repairing the Old Deck



Texturing the New Concrete






Painting the Rear of the Home




First Coat of Sealer





Second Coat of Sealer




The Cage has Arrived




New Cage Construction



The Finished Product









Monday, March 19, 2012

7718 ED


Before We Begin






Removing the Shutters



Looking for Repairs

 
 



Pressure Washing the Home






Cleaning the Fall Pipes



Shutters and Furniture Safely Stored



Sealing the Home


 

Tuesday, January 31, 2012

BT LIGHTS

Lights all assembled and pre-wired



Panels all assembled and pre-wired



One of the foundation forms.
24 inch diameter - 38 inch deep
the wood is supporting the metal frame work
it will be removed once the concrete is set




Second foundation option
The wood section sits on top of a 36 inch deep, 20 inch square box of hardie
The wood is supporting the metal frame work
and will be removed once the concrete is set





Panel mounter to the frame supporting frame
Unlike the prototype - the panels are positioned horizontally



Close-up of panel connection to framework




View of the post



Base of the post




The finished product