Friday, October 14, 2011

223 HPD Phase 2




New Rain Sensor Installed

Reclaimed Water Meter Installed 

Marking Out for the Pathway

Starting the Dig 

Found Cracked Irrigation Pipe... 

... with a 6 foot long root inside 

Installing the "Bubble Pot" 

Installing the Form Boards 

Pouring the Concrete 

The Finished Path 

Removing Broken Pathway 

Ready to Pour Concrete 

Bubble Pot at Rear of Home 

Changing Out the Lights 

Replacing Broken Slab with Ramp 

Gutters Being Pressed on Location 

Gutters Installed and Connected 

Installing Ramp to Front Door

Ramp - All Textured and Sealed 



No comments:

Post a Comment