Thursday, September 29, 2011

16029 BHL


Moving The Furniture Around


Removed Face Plates



Painting the Ceiling 





Protected Furniture



Cutting in the Walls 





Painting the Walls



Painting the Doors



Vaccuming Out the AC Vents





Cleaning the AC Grills



The Pool Deck - Before We Start





Pressure Washing the Deck



Fixing Cracks in the Pool Deck







Edging the Pool Deck





Starting the First Coat of Sealer



Edging the Outside of the Pool Deck





It Rained After the First Coat of Sealer
- Note How the Water Beads on the Surface



FINAL PHOTOS






























No comments:

Post a Comment