Thursday, June 23, 2011

7749 BC

Before We Start

Tile Removed 

Old Valve Uncovered 

New Valve in Place and Tested

Hardie on the Wall 

Tile Installed - Ready for Grouting 

Re-Enforfing Our Adivce About
Not Using the Upstairs Shower
After the Second Repair
(Will Remove on Friday) 

Friday, June 3, 2011

428 RC


Power Washing the House


Covering the Cracks


Applying the Sealer


Cutting in the Bottom


Back Door

  

Painting the House

 

Right Side and Front Done


Painting the Back


ALL DONE - FINAL PHOTOS





Installing the screens

 
 

All Done