Some "Before-we-start" shots:
-----
Kitchen Counter-Top Removed
Baseboards Removed
Doors and Baseboard Stacked for Painting
Some of the Paint has Arrived
Start of Painting the Ceilings
A Small Problem
Whilst Removing the Carpet Gripper, the Concrete
at the Patio Door Threshold Crumbled Away.
We Will Replace it with High-Tensile Concrete
The Tile Has Arrived
First Coat of Paint on the Walls
Painting the Window Sills
Second Coat of Paint Going on to the Walls
Original Toilet Removed
New Toilet in Place
Entrance Way Painted
Master Bedroom Fully Painted
Master Bathroom Restored
Small Master Bathroom Closet
Rear Left Bedroom
Rear Right Bedroom
Torn Screen in Rear Left Bedroom
Caused by Palm Tree Leaf Moving in the Wind
Lounge
Bathroom
New Toilet Sealed In
Starting the Tiling in the Rear Right Bedroom
More Tile Down
Rear Right Bedroom Fully Tiled
Rear Left Bedroom Tiled
Patio Door Threshold Filled Back In
Tiling the Lounge
Lounge Fully Tiled
Master Bedroom Tiled
Master Bedroom Passageway
Transition Strip Between Kitchen and Lounge
Kitchen Cut In...
... and Painted in Two Coats
Master Bedroom Floor Being Grouted
Sreen in Rear Left Bedroom Repaired
New Screen in Master Bedroom
New Blind in Master Bedroom
Bath Being Sealed
Rear Left Bedroom Grouted
Rear Right Bedroom Grouted
Master Bedroom Grouted
Lounge Grouted
Acid Washing the Floors to Remove Grout Haze
Installing Baseboards
Sealing the Baseboards
Washing Machine and Dryer
Fridge/Freezer
Range
Dishwasher
New Patio Table Top
Microwave
Fire Extinguisher
Appliance Manuals
Rear Left Bedroom
Rear Right Bedroom
Linnen Closet
Bathroom
Lounge
Master Bedroom
Master Bathroom
Master Bathroom Closet
Entry Way
AC and Heater Closet
Kitchen - Still Waiting on the Countertop
Not any more...
Countertop Installed
Project Completed
No comments:
Post a Comment