Front of the Home
Bushes at the Front Recovering
Right of Home
Rear
Left
Baked-in Oil Stains on Driveway
* * * * *
Trenching Out Around the Home
Power Washing the Pool Cage
Filling the Cracks
Table Repainted
Marking Out for the Slabs
The Area Dug Out
Silt Barrier and Hardcore Installed
Measuring Out for Levels
Starting to Lay the Slabs
Pool Equipment Slabs are down and Collared
Starting the Painting
Re-Screening the Window Screens
All the Painting is now Finished
New Door Locks, Lock Box and Numbers
Pool Blanket is is Good Condition
Various Views of the Screen Room
Bathroom have been Resealed
Patio Table Repainted and Restored
No comments:
Post a Comment