skip to main
|
skip to sidebar
Tuesday, July 26, 2011
708 OPC - Countertops
BEFORE WE BEGIN
Leveling the Wall
Top Installed
Installing the Main Area
ALL FINISHED
Wednesday, July 20, 2011
1259 RS - Roof
Broken Tiles Found in Various Locations
Large Damaged Area, Probably Caused by Falling Skylite
Patching the Roof Membrane
New Tiles in Place
Unsealed Vent Pipe
A bit of Over-Kill, but the Pipe is Sealed
Tuesday, July 19, 2011
7749 BC - Shower
UPSTAIRS BATHROOM
Doors Removed
Tile Removed
Cracks in the Base
Damage to the Subfloor
Removing the Subfloor
Hole in the Floor
New Subfloor Section
New Base in Place
Hardie Installed
First Wall Tiled
Second Wall Tiled
All Tiled and Starting to Grout
Finished Grouting
Installing the Doors
All Finished
LAUNDRY ROOM CEILING
The Hole
Closed Up
Taped and Mudded
Textured and Painted
DOWNSTAIRS BATHROOM
Tiles Removed
Installing the Tray
Starting the Tiling
2 Walls Done
All Done and Ready for Grouting
Grouted
Sealed and Finished
OWNER'S CLOSET
New Lock on Owner's Closet
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Blog Archive
►
2012
(9)
►
July
(1)
►
June
(2)
►
May
(1)
►
April
(2)
►
March
(1)
►
January
(2)
▼
2011
(40)
►
December
(4)
►
November
(3)
►
October
(5)
►
September
(3)
►
August
(3)
▼
July
(6)
708 OPC - Countertops
1259 RS - Roof
7749 BC - Shower
223 HPD
314 BDD
2903 ED
►
June
(2)
►
May
(2)
►
April
(3)
►
March
(1)
►
February
(6)
►
January
(2)
►
2010
(17)
►
December
(2)
►
November
(1)
►
September
(2)
►
July
(2)
►
June
(2)
►
May
(1)
►
April
(1)
►
March
(6)
►
2009
(7)
►
December
(1)
►
November
(6)